My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-12-16_PERMIT FILE - M2021067
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021067
>
2022-12-16_PERMIT FILE - M2021067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2022 8:34:38 PM
Creation date
12/19/2022 9:20:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021067
IBM Index Class Name
Permit File
Doc Date
12/16/2022
Doc Name
Adequacy Review Response
From
Asphalt Specialties Co.
To
DRMS
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINING DIAGRAM — Mine Phase and Mining Direction <br /> 0 <br /> m <br /> Q <br /> �N <br /> a*C <br /> Phase 4-Mine <br /> a < (+23 6 Acres) <br /> 3 Phase 2- • U. <br /> s Mine O <br /> a (11.8 Aaas) Phase 3-Mine <br /> (}24.6 Acres) I a r <br /> w <br /> a _. <br /> Phase 5-Rome <br /> 0: (±15.2 Acres) <br /> U. 6 <br /> Phase 1(t33.7 Acres)- z <br /> commercial operations z <br /> Aggregate wash plant, -� <br /> settling ponds,ditches,rtm <br /> outfau.office,truck scales <br /> and mine access. <br /> Phase 1(t7.7 Acres)- ✓/ <br /> Corranercial operation <br /> asphan hot plant and <br /> a recycle aggregate plart c • N`� <br /> STILES MWM RESWRCE- <br /> Conmercial and Mine Phase Areas of <br /> Operation and direction of mining.Revised <br /> 1111Q2M <br /> 4. Mine Phases 2 through 5 <br /> a . Mining Direction- Mine Phase 2 through 5 will be mined in a direction from north to <br /> south. <br /> b. 25 Acre Maximum Mine Disturbance Commitment- For the mining and backfill portion <br /> of the reclamation bond; for Phases 2 through 5, the maximum mining and backfill <br /> operation disturbance area is 25 acres at any one time. Multiple Phases of mining and <br /> backfill may be disturbed concurrently, provided the total area is equal to or less than <br /> 25 acres. <br /> c. The crushing and screening operations will process aggregate materials from each <br /> Phases aggregate excavation. <br /> i. Initially, each Phase will have the topsoil and overburden striped,±3 feet, and <br /> placed in temporary stockpiles. No dewatering trenches will be installed <br /> during the first striping operations. <br /> ii. Typically,the mining of each mine Phase will progress beginning at the <br /> outer edge of material will move toward the interior of the mine to allow <br /> for excavation of the exterior perimeter and slope. The mining slope is set <br />
The URL can be used to link to this page
Your browser does not support the video tag.