My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-12-01_REVISION - C1981028 (9)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2022-12-01_REVISION - C1981028 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2022 8:39:25 AM
Creation date
12/1/2022 10:35:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
12/1/2022
Doc Name Note
Findings & Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Coors Energy Company
Type & Sequence
SL11
Email Name
RDZ
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Worksheet Cont'd Task# I01 Page 2 of 4 <br /> Payload Capacity: 14.79 LCY <br /> Truck Bed(volume)Basis: <br /> Struck Volume: 12.00 LCY <br /> Heaped Volume: 18.00 LCY <br /> Average Volume: 15.00 LCY <br /> Adjusted Volume: 14.79 LCY <br /> Final Truck Volume Based on Number of Loader Passes: 14.20 LCY <br /> Loading Tool Capacity <br /> Bucket Size Class: Large <br /> Rated Capacity: 2.080 LCY(heaped) <br /> Bucket Fill Factor: 0.975 Loose material-mixed moist aggregates (95-100%)0.975 <br /> Adjusted Capacity: 2.028 LCY <br /> Job Condition Corrections: Site Altitude(ft.): 4000 feet <br /> Truck Loader Source <br /> Altitude Adj: 1.000 1.000 (CAT HB) <br /> Job Efficiency: 0.830 0.830 (CAT HB) <br /> Net Correction: 0.830 0.830 <br /> Loading Tool Cvcle Time: Number of Loading Tool Passes Required to Fill 7 passes <br /> Excavators and Front Shovels: <br /> Truck <br /> Machine Cycle Time vs. Job Condition Rating: ABOVE AVERAGE <br /> Selected Value within this Basic Rating: AVERAGE <br /> Track Loaders—Material Description: <br /> Cycle Time Elements(min.): <br /> Load: NA Maneuver: NA Dump: 0.100 <br /> Wheel and Track Loaders-Unadjusted Basic Loader Cycle Time(load,dump, NA minutes <br /> maneuver): <br /> Cycle Time Factors Factor(min.) Source <br /> Material: NA NA (Cat HB) <br /> Stockpile: NA NA (Cat HB) <br /> Truck Ownership: NA NA (Cat HB) <br /> Operation: NA NA (Cat HB) <br /> Dump Target: NA NA (Cat HB) <br /> Net Cycle Time Adjustment: NA minutes <br /> Adjusted Loader Cycle Time: 0.234 minutes <br /> Net Load Time per Truck: 1.504 minutes <br /> Truck Cvcle Time: <br /> Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.500 Minutes <br /> Truck Load Time: 1.504 Minutes Adjusted for site altitude: 1.504 Minutes <br /> Truck Maneuver and Dump 0.90 Minutes Adjusted for site altitude: 0.900 Minutes <br /> Time: <br /> Truck Travel(Haul&Return)Time: Road Condition:Firm, smooth,rolling_,dirt/It. surfaced,watered, <br /> maintained 3.0 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.