Laserfiche WebLink
Page 1 of 4 <br /> TRUCK/LOADER TEAM WORK <br /> Task description: Clean sediment from Pond 2,dispose in B-Pit <br /> Site: Keenesburg Strip Mine Permit Action: SLll Permit/Job#: C1981028 <br /> PROJECT IDENTIFICATION <br /> Task#: I01 State: Colorado Abbreviation: None <br /> Date: 10/18/2022 County: Weld Filename: CO28-I01 <br /> User: RDZ <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: Generic 12-18 cy,6x4 <br /> -Loader: Cat 320D L 9'-6" Stick <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: CAT 14M <br /> -Water Truck: Water Tanker,3,500 Gal. <br /> Cost Breakdown: Tmck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Excavator Load Area Dump Area Motor Water Truck <br /> Grader <br /> %Utilization-machine: 100 100 NA NA 25 25 <br /> Ownership cost/hour: $24.21 $63.65 NA NA $114.80 $14.98 <br /> Operating cost/hour: $57.28 $45.84 NA NA $19.85 $8.33 <br /> %Utilization-riper: NA 0 NA NA NA NA <br /> Ripper own. cost/hour: NA $0.00 NA NA $0.00 $0.00 <br /> Ripper op. cost/hour: NA $0.00 NA NA $0.00 $0.00 <br /> Operator cost/hour: $24.82 $46.87 NA NA $46.87 $0.00 <br /> Unit Subtotals: $106.31 $156.36 NA NA $181.52 $23.31 <br /> Number of Units: 3 1 0 0 1 1 <br /> Group Subtotals: Work: $475.29 Support: $0.00 Maine $204.83 <br /> Total work team cost/hour: $680.12 <br /> MATERIAL QUANTITIES <br /> Initial volume: 486 CCY Swell factor: 1.000 <br /> Loose volume: 486 LCY <br /> Source of estimated volume: Coors Site Plan;assume 4"deep sediment <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacitv: <br /> Truck Payload(weight)Basis: <br /> Material weight: 3,400 Pounds/LCY <br /> Description: Sand and gravel-Wet <br /> Rated Payload: 50,300 Pounds <br /> CIRCES Cost Estimating Software <br />