My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-11-21_PERMIT FILE - M2022050
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022050
>
2022-11-21_PERMIT FILE - M2022050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 8:40:07 PM
Creation date
11/22/2022 10:05:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022050
IBM Index Class Name
Permit File
Doc Date
11/21/2022
Doc Name
Application
From
J-2 Contracting Company
To
DRMS
Email Name
PSH
JLE
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(6) months (December 1, 2022—May 30, 2023). If the construction timeline needs to be extended, Property <br /> Owner must notify County by May 15,2023,in writing,of the new end date. <br /> 3.0 Haul trucks shall enter and exit the site at the approved access(es)on CR 40 and travel east-west to the <br /> nearest paved road for further dispersal. Any County roads used by traffic associated with TAP22-0019, <br /> TAP22-0020, and TAP22-0021 may become part of the established haul routes. <br /> 4.0 Weight Limits.No travel vehicles may exceed CDOT required specifications for pounds-per-axle and <br /> axle configurations unless overweight permits have been applied for and granted. <br /> 5.0 Temporary Deviations. In unusual or rare occasions, if projects mandate deviation from the <br /> above-mentioned haul route for a limited period (six months or less), Weld County Planning Services may <br /> authorize, in writing, the deviation. In that circumstance, haul vehicles will utilize paved county roads <br /> whenever possible. A deviation from the established haul route lasting more than six(6) months or requests <br /> for one(1)or more deviations within a 12-month period shall authorize the County to change the haul routes <br /> designated herein and provide notice to the Property Owner. <br /> 6.0 Haul Route Signage. Property Owner shall install travel route signs, if applicable, as per Manual of <br /> Uniform Traffic Control Devices standards, at all exit points of the Property which can be clearly seen by <br /> drivers leaving the facility and which clearly depict County approved travel route. <br /> 7.0 No Deviation from Permitted Haul Routes. Except as authorized by the Board pursuant to this <br /> Agreement,no use of any roads other than those specifically authorized for use in this Agreement is permitted <br /> without the prior written amendment of this Agreement. <br /> C. Maintenance Requirements: <br /> 1.0 Off-Site Dust Control/Abatement. The Property Owner is required to provide dust abatement along <br /> affected haul route roads, as determined by the County. The amount and extent of dust control measures will <br /> be determined by site-specific conditions at the time, as determined exclusively by County personnel. The <br /> County reserves the right to install traffic counters on the driveway(s)of the Property Owner's facility. <br /> 2.0 Obligation to Maintain Current and Future Haul Routes. Property Owner will be financially <br /> responsible for the excavation,repair,and patching of any damage on current or future haul route roads,which <br /> in the sole opinion of County has been created by vehicle traffic to and from the Property. Should Property <br /> Owner's site activities or vehicle circulation patterns change in the future so that County approves an alternate <br /> haul route, and all or a significant portion of Property Owner's sourced traffic no longer utilizes the <br /> above-described haul route and instead utilizes other portions of County roads,Property Owner shall cooperate <br /> with County in maintenance of said roads which are included within the new haul route. The type and method <br /> of repair will be determined by the County Engineer or his representative. Repairs shall commence within 48 <br /> hours of notification by the County for any roadway damage that exposes the driving public to adverse or <br /> unsafe driving conditions.All other repairs shall commence within thirty(30)days of receipt of Weld County's <br /> written notice. <br /> 2.1 Need for Immediate Repairs.In the event of damage to an Approved Haul Route by Project traffic <br /> that causes an immediate threat to public health and safety or renders the road impassible <br /> ("Significant Damage"),County shall,after inspection,notify Property Owner of such Significant <br /> Damage. Property Owner shall identify the repair required and shall consult with County on the <br /> extent, type, timing, materials, and quality of repair (i.e., temporary versus permanent) within <br /> twenty-four (24) hours after receipt of such notice and shall commence such repair within <br /> forty-eight (48) hours after receipt of such notice. If Property Owner identifies Significant <br /> Damage prior to receiving notice thereof from County,Property Owner may commence repair of <br /> David&Kayleen Hunt c/o J-2 Contracting Co.—TAP22-0019,TAP22-0020,TAP22-0021—RMCA22-0022 <br /> Page 2 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.