Laserfiche WebLink
8) Will groundwater be encountered and/or surface water intercepted or disturbed(check one): <br /> dDj Yes or C[ZL)No. <br /> a. If yes,please describe: <br /> 9) (Optional)Please provide additional information about the Mining Plan: <br /> The irrigation pond will be excavated at 3:1 slopes to a bottom elevation of 4751 which is above <br /> the highest groundwater level of 4750 found during excavation of exploratory test pits. The mining <br /> excavation will then be backfilled with 3 feet of impervious clay/overburden on the floor and <br /> slopes to create an impervious liner. The limits of mining and mining slopes are shown on the <br /> Exhibit E - Mining Plan map. A berm around the exterior of the mining, with a top wi th of 15 feet, <br /> will also be constructed using impervious clay overburden materials, ass own on the Exhibit E Reclamation Plan map. Overburden and topsgilwill stockpiled ow e mining plan <br />