Laserfiche WebLink
Demo Worksheet Cont'd Task#TTT Page 84 of 141 <br /> Total unit Cost/Hour: $251.58 <br /> Total Fleet Cost/Hour: $251.58 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 2,133 <br /> Swell factor: 1.000 <br /> Loose volume: 2,133 LCY <br /> Source of estimated volume: Mp King II-011A,Post-Mining X-Section Plan <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 50 feet <br /> Unadjusted hourly 1,400.0 LCY/hr <br /> production: <br /> Materials consistency Partly consolidated stockpile 1.1 <br /> description: <br /> Average push 0% <br /> gradient: <br /> Average site altitude: 7,500 feet <br /> Material weight: 2,900 lbs/LCY <br /> Weight description: Decomposed rock-50%Rock,50%Earth <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 1.100 (CAT HB) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.800 (FND-RF) <br /> Push gradient: 1.000 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.793 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.4344 <br /> Adjusted unit 608.16 LCY/hr <br /> production: <br /> Adjusted fleet 608.16 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.414/LCY <br /> Total job time: 3.51 Hours <br /> Total job cost: $882 <br /> CIRCES Cost Estimating Software <br />