Laserfiche WebLink
Demo Worksheet Cont'd Task#TTT Page 83 of 141 <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 1.000 (CAT HB) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.800 (FND-RF) <br /> Push gradient: 0.903 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.793 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.3566 <br /> Adjusted unit 499.24 LCY/hr <br /> production: <br /> Adjusted fleet 499.24 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.504/LCY <br /> Total job time: 8.62 Hours <br /> Total job cost: $2,168 <br /> BULLDOZER WORK <br /> Task description: King II-construct drainage channel in Cochrane Canyon <br /> Site: King Coal Mine Permit Action: RN8 Permit/Job#: C1981035 <br /> PROJECT IDENTIFICATION <br /> Task#: 309 State: Colorado Abbreviation: None <br /> Date: 5/5/2022 County: La Plata Filename: C035-309 <br /> User: JHB <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $97.46 NA <br /> Operating Cost/Hour: $97.63 100 <br /> Ripper own. $15.19 NA <br /> Cost/Hour: <br /> Ripper op.Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $41.30 NA <br /> CIRCES Cost Estimating Software <br />