Laserfiche WebLink
Demo Worksheet Cont'd Task#TTT Page 37 of 141 <br /> Material weight: 2,900 lbs/LCY <br /> Weight description: Decomposed rock-50%Rock,50%Earth <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 0.900 (CAT HB)) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.800 (FND-RF) <br /> Push gradient: 1.000 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.793 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.3554 <br /> Adjusted unit 361.48 LCY/hr <br /> production: <br /> Adjusted fleet 361.48 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.696/LCY <br /> Total job time: 10.40 Hours <br /> Total job cost: $2,616 <br /> CIRCES Cost Estimating Software <br />