Laserfiche WebLink
Demo Worksheet Cont'd Task#TTT Page 36 of 141 <br /> BULLDOZER WORK <br /> Task description: Kin;I-backfdl and regrade east and west sediment ponds <br /> Site: King Coal Mine Permit Action: RN8 Permit/Job#: C1981035 <br /> PROJECT IDENTIFICATION <br /> Task#: 023 State: Colorado Abbreviation: None <br /> Date: 5/4/2022 County: La Plata Filename: C035-023 <br /> User: JHB <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $97.46 NA <br /> Operating Cost/Hour: $97.63 100 <br /> Ripper own. $15.19 NA <br /> Cost/Hour: <br /> Ripper op.Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $41.30 NA <br /> Total unit Cost/Hour: $251.58 <br /> Total Fleet Cost/Hour: $251.58 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 3,226 <br /> Swell factor: 1.165 <br /> Loose volume: 3,758 LCY <br /> Source of estimated volume: Operator estimate <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 75 feet <br /> Unadjusted hourly 1,017.1 LCY/hr <br /> production: <br /> Materials consistency Compacted fill or embankment 0.9 <br /> description: <br /> Average push 0% <br /> gradient: <br /> Average site altitude: 7,400 feet <br /> CIRCES Cost Estimating Software <br />