Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: RN8 Summary of KI&KH tasks <br /> Site: King Coal Mine Permit Action: RN8 Permit/Job#: C1981035 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 5/19/2022 County: La Plata Filename: C035-000 <br /> User: JHB <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Demolish King I Structures DEMOLISH 1 50.00 $45,498 <br /> 002 King I-Rip 12"in upper facility area RIPPER 1 2.95 $772 <br /> 009 King I-revegetate highwall area(Area#4) REVEGE 1 4.00 $1,669 <br /> 010 King I-rip and final grade lower facilities area GRADER 1 1.09 $130 <br /> 012 King I-regrade cover of pre-law portion of refuse DOZER 1 8.11 $2,039 <br /> area <br /> 013 King I-regrade 6"growth medium on Waste Bank DOZER 1 5.76 $1,450 <br /> Expansion <br /> 014 King I-revegetate Waste Bank Expansion REVEGE 1 5.00 $3,312 <br /> 015 King I-Haul cover material to Waste Bank TRUCKI 1 152.37 $37,085 <br /> Expansion <br /> 016 King I-regrade 3.5'of cover on Waste Bank DOZER 1 29.75 $7,484 <br /> Expansion <br /> 017 Kin I-Haul topsoil topost-law refuse area TRUCKI 1 3.03 $739 <br /> 018 King I-finish grade post-law refuse area(area#6) GRADER 1 0.97 $114 <br /> 019 King I-revegetate refuse area(Area#6) REVEGE 1 2.00 $1,376 <br /> 020 King I-finish grade topsoil area GRADER 1 1.84 $215 <br /> 021 King I-revegetate borrow area REVEGE 1 4.00 $2,548 <br /> 022 King I-seal vent hole BOREHOLE 1 8.00 $1,467 <br /> 023 King I-backfill and regrade east and west DOZER 1 10.40 $2,616 <br /> sediment ponds <br /> 025 King I-revegetate east and west ponds(Area#6) REVEGE 1 4.00 $2,369 <br /> 032 King I-Rill and gully maint. 8 hours every other SITEMAINT 1 24.00 $5,030 <br /> yr, 10 yrs ENANCE <br /> 050 King I&II-mobilize for initial reclamation MOBILIZE 1 8.00 $11,125 <br /> 051 King I&II-mobilize for rill and gully MOBILIZE 1 8.00 $4,994 <br /> maintenance,X 3 <br /> 052 King I&II-mobilize for second pond cleaning MOBILIZE 1 8.00 $2,637 <br /> 060 King II-Rill and gully maint. 8 hours every other SITEMAINT 1 24.00 $5,149 <br /> yr, 10 yrs ENANCE <br /> 062 Weed Control over liability period REVEGE 1 35.00 $3,750 <br /> 064 Clean sediment ponds(two cleanings) EXCAVATE 1 65.13 $7,447 <br /> 065 King II-haul sediment from ponds to King I site TRUCKI 1 30.85 $26,626 <br /> 100 Seal Mine Openings MINESEAL 1 32.00 $179,904 <br /> 12A King I-regrade 6"growth medium on Waste Bank DOZER 1 5.76 $1,450 <br /> Expansion <br /> 200 King II structural demolition DEMOLISH 1 140.00 $310,538 <br /> 300 King II-Haul coal waste rock to King I waste pile TRUCKI 1 1.06 $346 <br /> 302 King II-Haul gravel from coal sales,portals, TRUCKI 1 14.81 $5,219 <br /> rd/wtr tank <br /> 303 King II-Haul office fill to portal cuts/acc rd/wtr TRUCKI 1 50.64 $21,937 <br /> tank <br />