My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-11-17_INSPECTION - C1981035
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981035
>
2022-11-17_INSPECTION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2022 12:52:44 PM
Creation date
11/18/2022 6:49:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Inspection
Doc Date
11/17/2022
Doc Name
Inspection Report
From
DRMS
To
GCC Energy, LLC
Inspection Date
11/8/2022
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 8, 2022 C-1981-035/King Coal Mine JHB <br /> The operator noted that they are currently mining in an area with more partings, so the operator will be working <br /> the pile during this time. <br /> ROADS—Rule 4.03 <br /> Construction 4.03.1(3)/4.03.2(3),Drainage 4.03.1(4)/4.03.2(4), Surfacing and Maintenance4.03.1(5) and <br /> (6)/4.03.2(5) and(6),Reclamation 4.03.1(7)/4.03.2(7): <br /> The access road to the Low Cover Crossing is being used infrequently now that the construction project is <br /> complete. Occasional access is still needed for access to monitoring wells and other maintenance. GCC will <br /> continue to maintain this access road and manage the Old Barn area. <br /> SUPPORT FACILITIES -Rule 4.04: <br /> Surface facilities at King II are in good condition. Ditches and culverts throughout the facilities are in <br /> good condition and appear ready for winter conditions. GCC is actively shipping coal. Eleven haul trucks were <br /> ready to load at the beginning of the inspection. <br /> TOPSOIL—Rule 4.06 <br /> Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br /> The topsoil stockpile east of the King II facilities needs the collection ditch on the west side of the pile <br /> cleaned out. There are fines mixed into this sediment so the material should be hauled off and not placed back on <br /> the topsoil stockpile. <br /> DOCUMENTS RECEIVED: The operator provided three revised pages for RN8 review.King II pages 5-7, 5-8, <br /> and 5-8 providing updates to officers and directors. <br /> OTHER(SPECIFY) <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> Number of Partial Inspection this Fiscal Year: 3 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 4 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.