5 <br /> i <br /> r <br /> Figure 1. A monitoring well will be constructed at this location to facilitate groundwater sampling. <br /> This monitoring well will be constructed at least 5 quarters in advance of mining below the <br /> groundwater level in Phases 3 and 4. The well will be permitted with the Colorado Division of <br /> Water Resources (CDWR) as a groundwater monitoring well. <br /> Constructing this well and sampling prior to the mining of Phase 3 and 4 will allow for the <br /> baseline groundwater quality conditions to be defined before any impacts from gravel mining <br /> may arise. Longer term sampling during mining will continue to take place at this location after <br /> Phase 3 and 4 of mining start. <br /> Delta Paving Gravel Pit <br /> Groundwater Monitoring Plan G-2-2 Lewieki&Associates <br /> September 2022 <br />