My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-11-15_ENFORCEMENT - M1982121
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M1982121
>
2022-11-15_ENFORCEMENT - M1982121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2022 8:33:01 PM
Creation date
11/17/2022 8:11:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982121
IBM Index Class Name
Enforcement
Doc Date
11/15/2022
Doc Name
BLM Modification Requirement
From
BLM
To
RMR Aggregages, Inc.
Email Name
CCW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Mailing address,phone number, and taxpayer identification number of the operator, and the BLM serial <br /> numbers of any unpatented mining claims where disturbance would occur. The operator must also identify <br /> one individual as the point of contact. 43 CFR §3809.401(b)(1) <br /> 2. A description of operations that includes, where applicable,maps showing all activity and facility <br /> locations; preliminary designs and operating plans; water management plans,rock characterization and <br /> handling plans; quality assurance plans; spill contingency plans; schedule of operations from start through <br /> closure; and plans for access,power, water, or support services. 43 CFR §3809.401(b)(2)(1)—(viii). <br /> 3. A plan for reclamation to meet the standards in 43 CFR §3809.420, with a description of the equipment, <br /> devices,and/or practices you propose to utilize. These can include drill-hole plugging; regrading and <br /> reshaping; mine reclamation, including information on the feasibility of pit backfilling that details <br /> economic, environmental, and safety factors; riparian mitigation; wildlife habitat rehabilitation; topsoil <br /> handling; revegetation; isolation and control of acid-forming,toxic, or deleterious materials; removal or <br /> stabilization of buildings, structures and support facilities; and any additional post-closure management. <br /> 43 CFR §3809.401(b)(3)(i)—(x). <br /> 4. A plan for monitoring the effect of your operations. This plan must meet and demonstrate compliance with <br /> the approved plan of operations and other Federal or State environmental laws and regulations,provide <br /> early detection of potential problems, and supply information that will assist in directing corrective actions <br /> should they become necessary. 43 CFR §3809.401(b)(4) <br /> Monitoring plans may incorporate existing State or other Federal monitoring requirements to avoid <br /> duplication. <br /> 5. An interim management plan for the project area during periods of temporary closure, including periods of <br /> seasonal closure, to prevent unnecessary or undue degradation. 43 CFR §3809.401(b)(5). <br /> Please provide a response to the above information requests in the form of a revised submittal within 45 days <br /> from receipt of this letter. Upon review of the required information, the BLM will determine whether or not <br /> the proposed Plan of Operations Modification is complete. <br /> Once the Plan of Operations Modification is determined complete under 43 CFR § 3809.401(b),the BLM <br /> will solicit public comment on the Plan under 43 CFR§3809.411(c), either separate from or as a part of the <br /> environmental review process required by the National Environmental Policy Act (NEPA). BLM must solicit <br /> public comment prior to making a decision on the proposed Plan of Operations Modification in accordance <br /> with 43 CFR § 3809.411(d). <br /> Occupancy Concurrence: <br /> Under 43 CFR§ 3715.3,the proposed Plan of Operations Modification must also include the information in <br /> the submitted"Occupancy Demonstration" for the Notice of Noncompliance under 43 CFR § 3715.3-2, in <br /> order for BLM to review this information concurrently with our review of your proposed Plan of Operations <br /> Modification. <br /> If RMI fails to submit the required information to comply with the enforcement orders within 45 days of <br /> receipt of this letter, the BLM will take action pursuant to 43 CFR § 3809.601(b) by requiring suspension of <br /> all or part of the Mid-Continent Quarry operations. BLM may also enforce the orders pursuant to the <br /> regulations at 43 CFR § 3809.604 or § 3809.700, and will require immediate temporary suspension or <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.