Laserfiche WebLink
�_♦ANT QF T•' � VS DFDA¢fMEM Oi THE IMERIO¢ <br /> P ...��'i'�`��F WRIAu OE 4EID WHAGEMEM <br /> N P United States Department of the Interior <br /> 5 <br /> CH ,a°9 BUREAU OF LAND MANAGEMENT <br /> Colorado River Valley Field Office <br /> 2300 River Frontage Road <br /> Silt, CO 81652 DECEIVED <br /> November 9, 2022 NOV 15 2022 <br /> In Reply Refer To:3809 (COG020) Colorado Diviabn of Redamatl�on, <br /> COC-074205 Uning and <br /> CERTIFIED MAIL—7020 1810 0000 3302 3662 <br /> RETURN RECEIPT REQUESTED <br /> Rocky Mountain Industrials <br /> RMR Aggregates, Inc. <br /> Attention: Mr. Brian Fallin, CEO <br /> 6200 S. Syracuse Way, Suite 450 <br /> Greenwood Village, CO 80111 <br /> Dear Mr. Fallin: <br /> Thank you submitting a proposed modification to the Plan of Operations for the Mid-Continent Quarry in <br /> response to the notice of noncompliance and the noncompliance order that BLM issued to Rocky Mountain <br /> Industrials (RMI) on August 30, 2022 ("enforcement orders"). BLM received your proposal on October 10, <br /> 2022. The information provided in your proposal is not sufficient for BLM to complete its review.- <br /> Accordingly, RMI must provide the additional information described below within 45 days of receipt of this <br /> letter. The following public lands are affected by your proposed modification. <br /> Sixth Principal Meridian, Colorado <br /> T. 5 S., R. 89 W., <br /> sec. 36, SE1/4. <br /> T. 6 S., R. 89 W., <br /> sec. 4, lots 2, 3, and NE1/4 SW1/4. <br /> Completeness Review: <br /> The proposed modification cannot be considered a minor modification under 43 CFR §3809.432(b) because <br /> the operations identified in the noncompliance order were not within the scope of BLM's NEPA analysis for <br /> the existing plan of operations. As further NEPA analysis is necessary for BLM to consider alternatives <br /> through which the operation can achieve compliance,the proposed modification must be reviewed in <br /> accordance with 43 CFR §3809.432(a). That provision requires BLM to determine whether the proposed <br /> Plan of Operations Modification meets the completeness requirements set out in 43 CFR§3809.401(b). <br /> Consistent with the surface management regulations at 43 CFR §3809.411(a), the BLM has reviewed the <br /> submitted modification to determine if it meets the content requirements at 43 CFR §3809.401(b). Based on <br /> our review,the following additional information is required for the proposed Plan of Operations <br /> Modification to be considered complete: <br /> INTERIOR REGION 7 • UPPER COLORADO BASIN <br /> COLORADO, NEW NiEVCO, UTAH NVY0MING <br />