Laserfiche WebLink
Page 4of10 <br /> TR132 <br /> Cycle Time: <br /> Scraper Loading Time: 1.00 Minutes <br /> Maneuver and Spread Time: 0.60 Minutes <br /> Job Condition Correction: Site Altitude: 6400 feet <br /> Scraper Push Dozer Source <br /> Altitude Adj: 1.000 NA (CAT HB) <br /> Job Efficiency: 0.830 NA (CAT HB) <br /> Net Correction: 0.830 NA <br /> Travel Time: <br /> Road Condition: Rutted dirt,little maintenance,no water, 1"tire penetration 4.0 <br /> Haul Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity Travel Time <br /> f m (min) <br /> 1 761.00 0.00 4.00 4.00 2394 0.49 <br /> Haul Time: 0.49 minutes <br /> Return Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity Travel Time <br /> (%) (%) (%) (f m) (min) <br /> 2 761.00 0.00 4.00 4.00 2910 0.43 <br /> Return Time: 0.43 minutes <br /> Total Scraper team cycle time: 2.52 minutes <br /> Adjusted for job conditions: 1,146.19 LCY/Hour <br /> Selected Number of Scrapers: 2 Scraper(s) <br /> Adjusted single scraper team(unit)hourly production: 1,146.19 LCY/Hour <br /> Adjusted multiple scraper team(fleet)hourly production: 1,146.19 LCY/Hour <br /> Unadjusted unit production/hour: 1,380.95 LCY/Hour <br /> Optimal Number of Scrapers per push <br /> dozer: <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 7.80 Hours <br /> Unit cost: $2.090 /LCY Total job cost: $18,678 <br />