My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-11-11_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2022-11-11_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2022 11:34:38 AM
Creation date
11/14/2022 7:28:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
11/11/2022
Doc Name
Adequacy Review - Preliminary
From
DRMS
To
Trapper Mining, Inc
Type & Sequence
TR132
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4of10 <br /> TR132 <br /> Cycle Time: <br /> Scraper Loading Time: 1.00 Minutes <br /> Maneuver and Spread Time: 0.60 Minutes <br /> Job Condition Correction: Site Altitude: 6400 feet <br /> Scraper Push Dozer Source <br /> Altitude Adj: 1.000 NA (CAT HB) <br /> Job Efficiency: 0.830 NA (CAT HB) <br /> Net Correction: 0.830 NA <br /> Travel Time: <br /> Road Condition: Rutted dirt,little maintenance,no water, 1"tire penetration 4.0 <br /> Haul Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity Travel Time <br /> f m (min) <br /> 1 761.00 0.00 4.00 4.00 2394 0.49 <br /> Haul Time: 0.49 minutes <br /> Return Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity Travel Time <br /> (%) (%) (%) (f m) (min) <br /> 2 761.00 0.00 4.00 4.00 2910 0.43 <br /> Return Time: 0.43 minutes <br /> Total Scraper team cycle time: 2.52 minutes <br /> Adjusted for job conditions: 1,146.19 LCY/Hour <br /> Selected Number of Scrapers: 2 Scraper(s) <br /> Adjusted single scraper team(unit)hourly production: 1,146.19 LCY/Hour <br /> Adjusted multiple scraper team(fleet)hourly production: 1,146.19 LCY/Hour <br /> Unadjusted unit production/hour: 1,380.95 LCY/Hour <br /> Optimal Number of Scrapers per push <br /> dozer: <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 7.80 Hours <br /> Unit cost: $2.090 /LCY Total job cost: $18,678 <br />
The URL can be used to link to this page
Your browser does not support the video tag.