Laserfiche WebLink
Page 3 of 10 <br /> TR132 <br /> SCRAPER TEAM WORK <br /> Task description: Replace Topsoil I/J Pit Spoil Dump <br /> Site: Trapper Mine Permit Action: TR132 Permit/Job#: C1981010 <br /> PROJECT IDENTIFICATION <br /> Task#: 090 State: Colorado Abbreviation: None <br /> Date: 10/4/2022 County: Moffat Filename: COIO-TRI32 <br /> User: RAR <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShiftbasis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 637G w/push-pull <br /> -Dozer: NA <br /> Support Equipment-Load Area: Cat D10T- IOSU <br /> -Dump Area: Cat D10T- IOSU <br /> Road Maintenance-Motor Grader: CAT 16M <br /> -Water Truck: Water Tanker,2,500 Gal. <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA 25 25 25 25 <br /> Ownership cost/hour: $287.19 NA $153.67 $153.67 $163.86 $10.28 <br /> Operating cost/hour: $277.83 NA $41.74 $41.74 $27.47 $5.08 <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own. cost/hour: NA NA $0.00 $0.00 $0.00 $0.00 <br /> Ripper op. cost/hour: NA NA $0.00 $0.00 $0.00 $0.00 <br /> Operator cost/hour: $30.90 NA $41.30 $41.30 $28.56 $21.12 <br /> Unit Subtotals: $595.92 NA $236.71 $236.71 $219.88 $36.48 <br /> Number of Units: 2 0 2 2 1 1 <br /> Group Subtotals: Work: $1,191.84 Support: $946.84 Maine $256.36 <br /> Total work team cost/hour: $2,395.04 <br /> MATERIAL QUANTITIES <br /> Initial volume: 7,357 CCY Swell factor: 1.215 <br /> Loose volume: 8,939 LCY <br /> Source of estimated volume: Appendix A,Table A-10-6 <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 1,600 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: Top Soil Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 51.00 LCY Adjusted Capacity: 29.00 LCY <br />