Laserfiche WebLink
Truck/Loader Worksheet Cont'd Page 4 of 6 <br /> TRUCK/LOADER TEAM WORK <br /> Task description: Topsoil Walk Road <br /> Site: Trapper Mine Permit Action: TR132 Permit/Job#: C1981010 <br /> PROJECT IDENTIFICATION <br /> Task#: NO2A State: Colorado Abbreviation: None <br /> Date: 11/9/2022 County: Moffat Filename: CO10-NO2A <br /> User: RAR <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shiftbasis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: Cat 777F <br /> -Loader: Cat 385C L 18'-1" Stick <br /> Support Equipment-Load Area: Cat D10T- IOSU <br /> -Dump Area: Cat D10T- IOSU <br /> Road Maintenance-Motor Grader: CAT 16M <br /> -Water Truck: Water Tanker, 14,000 Gal. <br /> Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Excavator Load Area Dump Area Motor Water Truck <br /> Grader <br /> %Utilization-machine: 100 50 25 25 25 25 <br /> Ownership cost/hour: $156.75 $195.53 $153.67 $153.67 $163.86 $105.66 <br /> Operating cost/hour: $133.38 $74.43 $41.74 $41.74 $27.47 $38.37 <br /> %Utilization-riper: NA 0 15 NA NA NA <br /> Ripper own. NA $0.00 $24.69 $0.00 $0.00 $0.00 <br /> cost/hour: <br /> Ripper op. cost/hour: NA $0.00 $1.81 $0.00 $0.00 $0.00 <br /> Operator cost/hour: $33.71 $37.32 $41.30 $41.30 $28.56 $0.00 <br /> Unit Subtotals: $323.84 $307.27 $238.52 $236.71 $219.88 $144.03 <br /> Number of Units: 2 1 1 1 1 1 <br /> Group Subtotals: Work: $954.95 Support: $475.23 Maine $363.91 <br /> Total work team cost/hour: $1,794.09 <br /> MATERIAL QUANTITIES <br /> Initial volume: 47,479 CCY Swell factor: 1.125 <br /> Loose volume: 53,414 LCY <br /> Source of estimated volume: Appendix A Tables A--2.1,A-10.6 <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br />