Laserfiche WebLink
Truck/Loader Worksheet Cont'd Page 3 of 6 <br /> Truck Cvcle Time: <br /> Truck Exchange Time: 0.80 Minutes Adjusted for site altitude: 0.800 Minutes <br /> Truck Load Time: 4.040 Minutes Adjusted for site altitude: 4.040 Minutes <br /> Truck Maneuver and Dump 1.20 Minutes Adjusted for site altitude: 1.200 Minutes <br /> Time: <br /> Truck Travel(Haul&Return)Time: Road Condition:Firm, smooth,rolling_,dirt/It. surfaced,watered, <br /> maintained 3.0 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 2288.00 2.80 3.00 5.80 1266 1.932 <br /> Haul Time: 1.932 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 2288.00 -2.80 3.00 0.20 3503 0.826 <br /> Return Time: 0.826 minutes <br /> Total Truck Cycle Time: 8.798 minutes <br /> Loading Tool unit <br /> Production 963.41 LCY/Hour Adjusted for job efficiency: 799.63 LCY/Hour <br /> Truck Unit Production <br /> 530.00 LCY/Hour Adjusted for job efficiency: 439.90 LCY/Hour <br /> Optimal No. of Trucks: 2 Truck(s) Selected Number of Trucks: 2 Truck(s) <br /> Adjusted hourly truck team production: 879.79 LCY/Hour <br /> Adjusted single truck/loader team production: 799.63 LCY/Hour <br /> Adjusted multiple truck/loader team production: 799.63 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 66.80 Hours <br /> Unit cost: $2.244 /LCY Total job cost: $119,842 <br />