Laserfiche WebLink
The average ground surface elevation is 4,667 ft and varies in elevation from 4,670 to 4,662.The existing <br /> ground surface slope is±0.001 ft/ft toward the northeast. It is expected that ground water will be met <br /> about six(6) feet below the ground surface. <br /> G—The primary commodity to be mined is sand and gravel.This material will be processed into various <br /> products and gradations to be used as a part of construction materials including such as asphalt, <br /> concrete, grout, structural fill, and aggregate base course. <br /> H—No incidental products. <br /> I—There are no explosives used in the mining process. <br /> J—The access road is to be constructed from WCR 394 to Parcel I and III. All other roads will be <br /> temporary at the mine site.ASCI intends to work cooperatively with the City of Evans on 35th Avenues <br /> future development and construction. See the Mine Plan for Access Road details.There is no installation <br /> of new road drainage or associated runoff conveyance structures. <br /> H\Pits HBP Plants\EVANS\Evans Mining Resource\DRMS Adequacy Revisions\Exh D Mine Plan Rev 101822 docx <br />