Laserfiche WebLink
I November 2022 C-1981-010/Trapper Mine RAR <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> Y - Air Resource Protection R - Roads <br /> N- Availability of Records R -Reclamation Success <br /> R -Backfill & Grading R -Revegetation <br /> NA -Excess Spoil and Dev. Waste Y - Subsidence <br /> R-Explosives Y - Slides and Other Damage <br /> R -Fish& Wildlife Y - Support Facilities On-site <br /> R -Hydrologic Balance R- Signs and Markers <br /> R - Gen. Compliance With Mine Plan NA - Support Facilities Not On-site <br /> NA - Other NA - Special Categories Of Mining <br /> NA -Processing Waste R—Topsoil <br /> COMMENTS <br /> This was a partial inspection of the Trapper Mine; permit C 1981010, operated by Trapper Mining Inc. <br /> The inspection was conducted and the report and photos prepared by me, Robin Reilley of the DRMS. <br /> Graham Roberts,Trapper Mine representative was present throughout the inspection. Skies were clear. <br /> Temperatures ranged between 32 and 50 degrees Fahrenheit. The air was calm, and dry. <br /> PERMITTING ACTIONS in PROGRESS: <br /> o Permit Renewal 8 RN8 <br /> o TR132 <br /> o Permit Revision 11 (PR11) <br /> MAINTENANCE ITEMS: <br /> OUTSTANDING MAINTENANCE: <br /> 1. Reconstructed drainage in parcels LAB18 and 19 require repairs scheduled for Spring 2023. <br /> INSPECTION <br /> GENERAL MINE PLAN COMPLIANCE: <br /> Activities in the L,N and I and J Pits were observed and appear to be progressing as permitted. The <br /> highwall miner was operating in I Pit East and coal was being transported out of the pit. I Pit East held <br /> water along the north higwall,therefore,high wall mining was not occurring at the west end of the pit. <br /> Backfilling is occurring at the east end of the Pit. Mining in I Pit Middle is complete and backfilling has <br /> begun. Digging of J Pit has begun and with overburden being hauled to I Pit Middle. <br /> D Pit regrading is nearly completed with backfilling and grading ongoing at the north end of the pit. The <br /> constructed drainage is in place and requires additional leveling in places where water will pool and cause <br /> nickpoints in a runoff situation. <br /> At the time of inspection N Pit was idle as contractors are in their 10 day off cycle. Backfilling the west <br /> high wall is ongoing as is backfilling the openings on the south highwall so that upper levels of coal can <br /> be extracted. The Queen Ann dragline,currently stationed in N Pit, is scheduled to walk(TR132),to west <br /> end of mine. The Molly Brown was casting spoil at the south end of the L Pit. Blasts were being set up. <br /> SIGNS and MARKERS Rule 4.02 <br /> o Topsoil stockpiles observed were clearly marked with identifying signs. <br /> Number of Partial Inspection this Fiscal Year: 4 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 2 of 9 <br />