My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-11-01_INSPECTION - C1982056
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982056
>
2022-11-01_INSPECTION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2022 10:04:31 AM
Creation date
11/2/2022 6:36:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Inspection
Doc Date
11/1/2022
Doc Name
Inspection Report
From
DRMS
To
Twentymile Coal, LLC
Inspection Date
10/19/2022
Email Name
TNL
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 19,2022 C-1982-056/Foidel Creek Mine TNL <br /> Location Holding discharging source goes to notes <br /> water <br /> 61VIN Reservoir y N mine water Recirculates NW diversion ditch was <br /> mine water. checked with no issues. <br /> Does not have <br /> a discharge pt. <br /> 61VIN ventilation shaft y N pad runoff <br /> sed pond <br /> 61VIN wetlands y N Underground 61VIN reservoir Water from ponds is pumped <br /> dewatering to the 61VIN reservoir, no <br /> discharge is currently <br /> approved at this site <br /> Fish Creek Tipple pond y y Reclaimed tipple Fish creek Diversion ditch along the N <br /> side of the tipple was <br /> checked with no issues. <br /> Fish Creek Borehole y N mine water (w/ Fish creek 3 cell pond, discharge at site <br /> flock added) (site 115) 115 triggers additional <br /> sampling requirements. <br /> 18LT vent shaft ponds N N pad Pad is not active <br /> Pond F N N runoff from Foidel <br /> facilities <br /> Pond G N N Surface Runoff Foidel <br /> from laydown <br /> Area <br /> Pond E y y Facilities and Foidel Cleaned Fall 2022 <br /> roads <br /> Area No. 1 Pond (Pit y N mine, sumps, Pond D <br /> Pond) diversion dich <br /> Pond D y y Wash plant Foidel Cleaned Fall 2022 <br /> facilities, pit <br /> pond <br /> Pond B y N Bob pile, road Foidel Cleaned Fall 2022 <br /> Pond C N N facilities Generally dry <br /> Pond T N N laydown area Foidel v-notch weir, culvert under <br /> railway always trickling <br /> Facility Treatment y N facilities water GW discharge Currently approved to go to <br /> ponds the million gallon tank. <br /> Revision is needed to update <br /> PAP. <br /> Number of Partial Inspection this Fiscal Year: 2 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 3 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.