My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-10-27_GENERAL DOCUMENTS - C1981041
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981041
>
2022-10-27_GENERAL DOCUMENTS - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2022 11:24:47 AM
Creation date
10/27/2022 11:24:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
General Documents
Doc Date
10/27/2022
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Snowcap Coal Company, Inc
Type & Sequence
RN8
Permit Index Doc Type
Findings
Email Name
CCW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SL-9 was approved on November 23, 2016. SL- 9 approved Phase II bond release on 13.1 acres <br /> and Phase III Bond release on 9.6 acres. The release terminated the Division's jurisdiction on 0.2 <br /> acres of undisturbed land overlying underground workings. <br /> SL-10 was approved on July 24, 2017. SL-10 approved Phase III bond release on 4.0 acres located <br /> at the Roadside North Portal area. The areas had been approved for an industrial post-mining land <br /> use. <br /> SL-I I was approved on September 16, 2019. SL-I I approved the bond release of acres associated <br /> with the Roadside Portals Mine: Phase II and III release of 2.4 acres, Phase III for 8.0 acres, and <br /> Phase III release for 291.3 acres of undisturbed acreage. <br /> History <br /> The DeBeque Canyon area within and adjacent to the current permit area has been historically <br /> disturbed by coal mining activities since the late 1800's, and the Colorado River alluvial valley <br /> floor area which has been altered and affected by these operations has been "grandfathered" into <br /> the permit area. The Cameo Power Plant,which was a customer for coal from the Roadside Portals <br /> when the mine was operating, was located just south of the North Portal facilities, on the west side <br /> of the river.The Cameo Power Plant closed at the end of 2010 and has been completely demolished <br /> and reclaimed. The Cameo Power Plant area is part of the shooting range. <br /> Underground mining operations using modern, mechanized methods began in 1974. Between <br /> 1974 and 1999, approximately 242 acres of surface lands were disturbed in conjunction with the <br /> operation. GEX Colorado, Inc. submitted the original permanent program permit application for <br /> the Roadside and Cameo Mines on February 17, 1981, pursuant to Section 34-33-109 of the <br /> Colorado Surface Coal Mining Reclamation Act. On December 31, 1981, the Roadside and <br /> Cameo Mines were purchased by Powderhorn Coal Company (PCC). Following the review <br /> process for the initial permanent program permit application, the Division issued a permit with <br /> stipulations on January 3, 1983. <br /> On November 9, 1984, Powderhorn Coal Company submitted plans for a permit revision to <br /> construct two new coal processing waste embankments to be located north (CRDA-2) and west <br /> (CRDA-3) of the existing Cameo Refuse Disposal Area (CRDA-1). This revision was approved <br /> on March 11, 1985. <br /> In October 1986, Powderhorn Coal Company notified the Division of temporary cessation of <br /> operations at the Roadside and Cameo Mines. In early 1987, Peabody Holding Company <br /> (Peabody) purchased the inactive Roadside and Cameo Mines. Peabody retained the Powderhorn <br /> Coal Company name for the company. On April 20, 1989, Powderhorn Coal Company (PCC) <br /> notified the Division of its intent to emerge from temporary cessation status on May 1, 1989. The <br /> mine was active from that date, until December, 1999, producing up to 70,000 tons of clean coal <br /> per month. Up until November 1994, production was limited to the Roadside South Portal, but at <br /> that time the North Portal was reactivated, and coal was produced from both portals until early <br /> 1997, when all coal production was shifted to the North Portal. Due primarily to coal quality <br /> problems, mining ceased on December 2, 1999. By letter, on December 13, 1999, the operator <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.