My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-09-23_REVISION - M2012032
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2022-09-23_REVISION - M2012032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2022 4:26:53 PM
Creation date
10/12/2022 2:12:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
9/23/2022
Doc Name
Adequacy Review Response #2
From
Ouray Silver Mines, Inc
To
DRMS
Type & Sequence
AM2
Email Name
LJW
THM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
666
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
part of Exhibit F. Buildings to remain post mining also are shown on Map F-1 and <br /> Map F-Ia. For the buildings that will be demolished and that have concrete <br /> foundations,the concrete will be broken up and used to backfill the portal areas or <br /> will be capped with a minimum of 3 feet of fill/cover material below final <br /> reclamation grade. <br /> Monitoring wells will be plugged and abandoned in accordance with guidance from the <br /> State Engineers Office (SEO). In general, the area around the well will be dug down <br /> approximately 1 foot and the well casing will be cut. The well will be filled with crushed <br /> rock and the top 3 feet of the well will be plugged with concrete. The 1-foot hole will be <br /> backfilled with 3-inch rock to match groundcover in the area around the well. <br /> 3.4 Portal Areas <br /> There are three portal areas that will be reclaimed: the underground shop (3 portals), <br /> the mill, and the Revenue tunnel portal. Approximately 2200 cubic yards of waste rock <br /> will be used to backfill the 3 UG storage portals. The Mill portal will be backfilled <br /> with equipment and demolition debris, and the main portal will not be backfilled. The <br /> reclamation of each portal will proceed in the following manner: <br /> Portal Dimension Waste Rock Volume to Reclamation Steps <br /> (feet) be placed in Portals <br /> (approximate) <br /> UG Storage Portal 1 20 x 15 990 CY Remove steel doors <br /> UG Storage Portal 2 20 x 15 990 CY Backfill with demolition <br /> debris and waste rock into <br /> UG Storage Portal 3 tunnel <br /> 8 x 8 220 CY Regrade backfill slope to <br /> 2H:1 V <br /> Mill Portal 35 x 35 NA Backfill empty mill tunnel <br /> with demolition debris <br /> Seal steel door to prevent <br /> access <br /> Revenue Portal 12 x 12 NA Install steel bat gate on <br /> portal <br /> Exhibit E Reclamation Plan E-8 <br /> Amendment 02 <br /> Updated August 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.