My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-09-23_REVISION - M2012032
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2022-09-23_REVISION - M2012032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2022 4:26:53 PM
Creation date
10/12/2022 2:12:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
9/23/2022
Doc Name
Adequacy Review Response #2
From
Ouray Silver Mines, Inc
To
DRMS
Type & Sequence
AM2
Email Name
LJW
THM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
666
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.3 Dismantle Buildings and Structures at Portal Area <br /> Reclamation will include the removal of certain buildings and other structures. The <br /> following structures will be removed at the Revenue Portal area: <br /> • Diesel storage and filling station <br /> • Propane storage A <br /> • Propane storage B <br /> • Propane storage C <br /> • Ventilation Fan <br /> • Underground warehouse and shop <br /> • Waste storage building and secondary containment <br /> • Tailing thickener tank and related super structure <br /> • Materials storage buildings(2) <br /> • Crusher and retaining wall <br /> • Monitoring wells <br /> The facilities generally have either 6 or 12-inch concrete foundations. As shown on <br /> Map F-1 and Map F-1 a, various structures will remain as part of the post-mine land <br /> use. Mill equipment will be removed and repurposed or sold upon final reclamation. <br /> As noted in TR-14 and TR-15, process water and mill reagents will be drained from <br /> tanks and piping prior to dismantling the structures. The intent is for mill reagents to <br /> be used in the process. Remaining reagents and other chemicals, if any, will be either <br /> returned to the manufacturer or characterized and properly disposed of in accordance <br /> with waste disposal regulations. Should process tanks and piping require <br /> detoxification, OSMI anticipates the volume of water to rinse the system to be 10,000 <br /> to 40,000 gallons. Rinse water will be contained, characterized and disposed of in <br /> accordance with application regulatory requirements. <br /> A list of buildings / structures that will remain on site is provided on Map F-1 a as <br /> Exhibit E Reclamation Plan E-7 <br /> Amendment 02 <br /> Updated August 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.