My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-09-23_REVISION - M2012032
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2022-09-23_REVISION - M2012032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2022 4:26:53 PM
Creation date
10/12/2022 2:12:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
9/23/2022
Doc Name
Adequacy Review Response #2
From
Ouray Silver Mines, Inc
To
DRMS
Type & Sequence
AM2
Email Name
LJW
THM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
666
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Connex/refuge chamber and other disturbance within the permit boundary. The total area <br /> for the permit is 51.69 acres. <br /> The total acreage of the commercial/industrial land use area is approximately 4.4 acres. <br /> The remaining 17.2 acres of disturbance to be reclaimed under the Reclamation Plan as <br /> well as the areas that are not disturbed will be used for wildlife habitat. These different <br /> reclamation practices are shown on Reclamation Map F-1 in Exhibit F. <br /> 2 RECLAMATION TIMETABLE <br /> The reclamation timetable below is based on the projections for the mine and the amount <br /> of reclamation that is needed after mine shutdown. Once the mine is permanently <br /> closed, reclamation is expected to take approximately 6 months. <br /> Table E-2 Reclamation Timetable <br /> Task # Description Time <br /> Needed <br /> (Months) <br /> 1 Commence mining. Complete construction of Atlas TSF complete <br /> 2 Mine underground ore material and process. Add 42.1 <br /> tailings to Revenue and Atlas TSFs. <br /> 3 Cap and revegetate Revenue TSF. Store topsoil for Atlas 26.1 <br /> TSF. <br /> 4 Complete mining. Cap and revegetate Atlas TSF 2 <br /> 5 Backfill underground portals. 1 <br /> 6 Remove select surface facilities 1 <br /> 7 Cap and revegetate remaining disturbance areas. Install 1 <br /> Revenue Portal bat gate. <br /> Total Months 76.2 <br /> Total Years 6.35 <br /> Exhibit E Reclamation Plan E-4 <br /> Amendment 02 <br /> Updated August 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.