Laserfiche WebLink
Connex/refuge chamber and other disturbance within the permit boundary. The total area <br /> for the permit is 51.69 acres. <br /> The total acreage of the commercial/industrial land use area is approximately 4.4 acres. <br /> The remaining 17.2 acres of disturbance to be reclaimed under the Reclamation Plan as <br /> well as the areas that are not disturbed will be used for wildlife habitat. These different <br /> reclamation practices are shown on Reclamation Map F-1 in Exhibit F. <br /> 2 RECLAMATION TIMETABLE <br /> The reclamation timetable below is based on the projections for the mine and the amount <br /> of reclamation that is needed after mine shutdown. Once the mine is permanently <br /> closed, reclamation is expected to take approximately 6 months. <br /> Table E-2 Reclamation Timetable <br /> Task # Description Time <br /> Needed <br /> (Months) <br /> 1 Commence mining. Complete construction of Atlas TSF complete <br /> 2 Mine underground ore material and process. Add 42.1 <br /> tailings to Revenue and Atlas TSFs. <br /> 3 Cap and revegetate Revenue TSF. Store topsoil for Atlas 26.1 <br /> TSF. <br /> 4 Complete mining. Cap and revegetate Atlas TSF 2 <br /> 5 Backfill underground portals. 1 <br /> 6 Remove select surface facilities 1 <br /> 7 Cap and revegetate remaining disturbance areas. Install 1 <br /> Revenue Portal bat gate. <br /> Total Months 76.2 <br /> Total Years 6.35 <br /> Exhibit E Reclamation Plan E-4 <br /> Amendment 02 <br /> Updated August 2022 <br />