Laserfiche WebLink
2) When a new phase of mining begins (e.g., Phase 3 of mining is completed, and <br /> Phase 4 begins). <br /> 1.3. Sampling Parameters <br /> Grand Junction Pipe &Supply Co. will perform field and laboratory analysis of their <br /> samples for the water quality parameters identified in <br /> Delta Paving Gravel Pit <br /> Groundwater Monitoring Plan G-2-4 Lcwicki&Associates <br /> September 2022 <br />