Laserfiche WebLink
5. Reclamation Timetable and Sequence <br /> The sequence and timing of reclamation can be seen in Table E-3 below. The reclamation <br /> schedule is dependent on the rate of mining which will fluctuate due to market demands. The <br /> operator will reclaim the site concurrently with the progression of mining to limit the total <br /> disturbance. <br /> Table E-3 Reclamation Timetable <br /> Description Time Required <br /> Develop and mine phase 1 5 years <br /> Develop and mine phase 2 while reclaiming previous 5 years <br /> phases <br /> Develop and mine phase 3 while reclaiming previous 5 years <br /> phases <br /> Develop and mine phase 4 while reclaiming previous 5 years <br /> phases <br /> Backfill,topsoil,and revegetate remainder of the site 1 year <br /> that is unreclaimed <br /> Vegetation monitoring 2 years <br /> Total 23 years <br /> 6. Revegetation Plans <br /> Seed will be placed in all areas to be vegetated following grading, topsoiling, and discing of the <br /> soil. Areas outside of the lake slopes will be seeded with a Rangeland Seed Mix, while the <br /> slopes around the lakes will be seeded with a Wetland Seed Mix. The recommended mixes to <br /> be used are as follows: <br /> 6.1 . Rangeland Seed Mix <br /> Species Pounds of pure live seed per acre(drilled) <br /> Blue Gamma 0.4 <br /> Galleta grass 0.5 <br /> Indian ricegrass 1.5 <br /> Sand Dropseed 0.1 <br /> Sainfoin 1.0 <br /> Total 3.5 <br /> 6.2. Wetland Seed Mix <br /> Species Pounds of pure live seed per acre(drilled) <br /> Slender Wheatgrass 3.0 <br /> Basin Wildrye 1.5 <br /> Delta Paving Gravel Pit E_3 Lewicki&Associates <br /> September 2022 <br />