Laserfiche WebLink
EXHIBIT E RECLAMATION PLAN <br /> 1 . General Reclamation Plan <br /> The total disturbed area to be reclaimed under this permit is 110 acres out of the 145-acre <br /> permit area. The reclamation plans of the Delta Paving Gravel Pit involve converting the site to <br /> its ultimate post mining land use as private recreation and wildlife habitat with multiple <br /> groundwater lakes surrounded by rangeland and wetlands. Reclamation will occur <br /> contemporaneously as portions of the site are mined. Final reclamation will occur after all <br /> mining activities have been completed. The pre-mine land use is predominantly irrigated fields <br /> with woodlands and wetlands to the north of the site along the Gunnison River. The remaining <br /> land use is previously disturbed industrial land used as a processing and operating area by the <br /> operator. Pursuant to Rule 6.4.5.2(b), the applicant evaluated the post-mine land use in regard <br /> to adopted state and local land use plans for this area and adjacent land uses. The proposed <br /> post-mine land use of private recreation and wildlife habitat with groundwater lakes and <br /> rangeland is compatible with the general character of the area. <br /> The permit and affected area of the site are 145 acres, not all of which will be disturbed and <br /> require reclamation. Table E-1 below summarize the final land uses within the affected area <br /> upon completion of reclamation. <br /> Table E-1 Reclamation Areas <br /> Description Area <br /> Access Roads 1.0 <br /> Rangeland 34.7 <br /> Groundwater Lakes* 74.3 <br /> Disturbed Area Total 110.0 <br /> Undisturbed Area 34.8 <br /> Total Affected Permit Area 144.8 <br /> *58.7 acres of new groundwater exposure from mining+34.7 acres of <br /> existing exposure <br /> After each phase of mining is completed, backfilling and grading of that area will commence. All <br /> mining slopes will be backfilled and graded using a grader to a maximum 3H:1V slope. The <br /> slopes will be compacted for stabilization and to prevent erosion. The dewatering pump will be <br /> removed from the pits as well as any other permanent and portable facilities. All berms will be <br /> flattened after all phases of mining are complete. The disturbed area surrounding the lakes and <br /> the topsoil zone on the pit slopes be topsoiled and revegetated as the final steps of reclamation. <br /> Topsoil will be replaced from the stockpiled material in a single five-inch lift. Revegetation will be <br /> completed using a native seed mix recommended by the Natural Resource Conservation <br /> Service. <br /> Delta Paving Gravel Pit E-I Lewicki&Associates <br /> September 2022 <br />