Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task#006 Page 3 of 3 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 5280.00 5.00 2.00 7.00 1568 3.400 <br /> Haul Time: 3.400 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 5280.00 -5.00 2.00 -3.00 2938 1.853 <br /> Return Time: 1.853 minutes <br /> Total Truck Cycle Time: 9.911 minutes <br /> Loading Tool unit <br /> Production 175.63 LCY/Hour Adjusted for job efficiency: 145.78 LCY/Hour <br /> Truck Unit Production <br /> 66.11 LCY/Hour Adjusted for job efficiency: 54.87 LCY/Hour <br /> Optimal No.of Trucks: 3 Truck(s) Selected Number of Trucks: 3 Truck(s) <br /> Adjusted hourly truck team production: 164.60 LCY/Hour <br /> Adjusted single truck/loader team production: 145.78 LCY/Hour <br /> Adjusted multiple truck/loader team production: 145.78 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 21.95 Hours <br /> Unit cost: $2.818 /LCY Total job cost: $9,017 <br /> CIRCES Cost Estimating Software <br />