My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-09-23_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2022-09-23_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2022 1:27:00 PM
Creation date
9/23/2022 1:24:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
9/23/2022
Doc Name
Adequacy Review
From
DRMS
To
Colowyo Coal Company L.P.
Type & Sequence
TR155
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Worksheet Cont'd Task 4 006 Page 2 of 3 <br /> Truck Bed(volume)Basis: <br /> Struck Volume: 10.00 LCY <br /> Heaped Volume: 12.00 LCY <br /> Average Volume: 11.00 LCY <br /> Adjusted Volume: 12.00 LCY <br /> Final Truck Volume Based on Number of Loader Passes: 10.92 LCY <br /> Loading Tool Capacity <br /> Bucket Size Class: Small <br /> Rated Capacity: 1.560 LCY(heaped) <br /> Bucket Fill Factor: 0.875 Loose material- 1/2"to 3/4"(85 -90%)0.875 <br /> Adjusted Capacity: 1.365 LCY <br /> Job Condition Corrections: Site Altitude(ft.): 7600 feet <br /> Truck Loader Source <br /> Altitude Adj: 0.970 1.000 (CAT HB) <br /> Job Efficiency: 0.830 0.830 (CAT HB) <br /> Net Correction: 0.805 0.830 <br /> Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: 8 passes <br /> Excavators and Front Shovels: <br /> Machine Cycle Time vs.Job Condition Rating: SEVERE <br /> Selected Value within this Basic Rating: SEVERE <br /> Track Loaders—Material Description: <br /> Cycle Time Elements(min.): <br /> Load: NA Maneuver: NA Dump: 0.100 <br /> Wheel and Track Loaders-Unadjusted Basic Loader Cycle Time(load,dump,maneuver): NA minutes <br /> Cycle Time Factors Factor(min.) Source <br /> Material: NA NA (Cat HB) <br /> Stockpile: NA NA (Cat HB) <br /> Truck Ownership: NA NA (Cat HB) <br /> Operation: I NA I NA I (Cat HB) <br /> Dump Target: I NA NA (Cat HB) <br /> Net Cycle Time Adjustment: NA minutes <br /> Adjusted Loader Cycle Time: 0.445 minutes <br /> Net Load Time per Truck: 3.215 minutes <br /> Truck Cycle Time: <br /> Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.515 Minutes <br /> Truck Load Time: 3.215 Minutes Adjusted for site altitude: 3.215 Minutes <br /> Truck Maneuver and Dump Time: 0.90 Minutes Adjusted for site altitude: 0.928 Minutes <br /> Truck Travel(Haul&Return)Time: Road Condition:Hard,smooth,stabilized,surfaced,watered, <br /> maintained 2.0 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.