My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-09-20_INSPECTION - C1981018
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981018
>
2022-09-20_INSPECTION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2022 6:27:58 AM
Creation date
9/20/2022 3:35:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Inspection
Doc Date
9/20/2022
Doc Name
Inspection Report
From
DRMS
To
Blue Mountain Energy, Inc
Email Name
CCW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 15,2022 C-1981-018/Deserado Mine CAB <br /> Rills do not appear to have affected the pile's stability. The slopes are included on the maintenance list for this <br /> fall. The ditch paralleling the access road on the east side of the RP-2/3/4 pile is filling with sediment. The ditch <br /> is located on the east side of the road. The ditch cleaning has been added to the maintenance list for this fall. <br /> Activity of placing refuse material on the RP-A refuse pile was occurring during the inspection. The base of the <br /> pile is progressing. The refuse disposal are was stable and there were no indications of erosional concerns. <br /> SUPPORT FACILITIES -Rule 4.04: <br /> Support Facilities inspected included;the main facilities/portals area,prep plant(Photo 7),B Seam Vent <br /> Shaft No. 1 (Photo 8),RDH-2,RDH-4,Nitrogen Plant No. 2, Slot Storage (Photo 9),Conveyor Corridor, and the <br /> Explosives Storage. Pads for the support facilities were damp but stable. There were no locations with erosional <br /> issues. Pads with cut slopes were stable with no erosional concerns. Berms were intact and stable with vegetative <br /> cover.There were no off site impacts observed. <br /> DOCUMENTS RECEIVED: None <br /> OTHER(SPECIFY): None <br /> Number of Partial Inspection this Fiscal Year: 2 <br /> Number of Complete Inspections this Fiscal Year: 0 <br /> Page 4 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.