Laserfiche WebLink
State of Colorado <br /> DEPARTMENT OF NATURAL RESOURCES <br /> DIVISION OF RECLAMATION,MINING AND SAFETY <br /> Page 13 of 13 <br /> X. SUMMARY OF COSTS <br /> This section shall be used to summarize all the cost sheets in one place. <br /> (V)Total of all Plant Structures & Equipment Removal Costs $ 0 <br /> (VI)Total of all Primary Reclamation Activities Costs $ 8,468 <br /> (VII)Total of all Revegetation Costs $ 5,395 <br /> (VII)Total of all Miscellaneous Costs $ 0 <br /> (IX)Total of all Monitoring Costs $ 2,076 <br /> Total of Direct Costs $ 15,940 <br /> XI. SUPERVISION /PROFIT&OVERHEAD/CONTINGENCIES/MOBILIZATION <br /> (A) Liability Insurance( 2.0 %) $ 322 <br /> (B) Profit/Overhead ( 10.0 %) $ 1,594 <br /> (C) Performance Bond ( 1.1 %) $ 167 <br /> (D) Contingencies ( 5.0 %) $ 797 <br /> Total of Indirect Costs $ 2,880 <br /> Total of Direct and Indirect Costs $ 18,820 <br /> (E) Division of Reclamation, Mining and Safety Administrative Costs 5% $ 941 <br /> Total Estimated Cost of Reclamation $ 19,761 <br /> Exhibit L-Reclamation Cost Estimate www.sespeconsulting.com <br />