Laserfiche WebLink
State of Colorado <br /> DEPARTMENT OF NATURAL RESOURCES <br /> DIVISION OF RECLAMATION,MINING AND SAFETY <br /> Page 12 of 13 <br /> Task IX-Monitoring <br /> The following activity level was assumed to be necessary to maintain the site in good condition prior to development: <br /> Maintenance <br /> Site maintenance(weed control,general revegetation maintenance,and erosion control maintenance)will be conducted on the <br /> vegetation installed at the site.This estimate assumes that site maintenance will require one(1)landscape maintenance laborer <br /> two(2)days per year to conduct maintenance activities before and after rainy seasons for three(3)years,totaling 48 man-hours <br /> (8 hours/visit). <br /> Task Cost Summary <br /> Item cost <br /> Equipment Cost $ 1,488 <br /> Labor Cost $ 588 <br /> Other Cost $ - <br /> Total Cost: $ 2,076 <br /> Equipment Cost <br /> Activity Equipment Quantity Total Hours $ Hour Cost <br /> Transportation jPickupTruck 1 48 $ 31.00 $ 1,488 <br /> $ 1,488 <br /> Source:CalTrans Labor Surcharge and Equipment Rental Rates <br /> Labor Cost <br /> Activity Labor Category Quantity Hours $ Hour Cost <br /> Revegetation Maintenance Landscape&Irrigation Laborer 1 48 $ 12.26 $ 588 <br /> $ 588 <br /> Source:State of Colorado Prevailing Wage Rate Determinations(Davis-Bacon Act WD#CO20210008)El Paso,Pueblo,Teller County Rates <br /> Other Cost <br /> Activ!V Category Quanti Unit Unit Cost Cost <br /> None I $ <br /> Total: $ - <br /> Assumptions <br /> Landscape Labor <br /> 2 Number of Field Days/Year(Vegetation and Erosion Control) <br /> 1 Number of Laborers <br /> 3 Years to Monitor <br /> 6 Total Field Visits <br /> 48 Total Time(Hours) <br /> Exhibit L-Reclamation Cost Estimate www.sespeconsulting.com <br />