My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-09-07_REVISION - M1987171
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987171
>
2022-09-07_REVISION - M1987171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2025 6:37:49 AM
Creation date
9/8/2022 9:04:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987171
IBM Index Class Name
Revision
Doc Date
9/7/2022
Doc Name
Request for Technical Revision
From
Kiewit
To
DRMS
Type & Sequence
TR4
Email Name
TC1
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State of Colorado <br /> DEPARTMENT OF NATURAL RESOURCES <br /> DIVISION OF RECLAMATION,MINING AND SAFETY <br /> Page 6 of 13 <br /> VI. PRIMARY RECLAMATION ACTIVITY <br /> Methods to be used: <br /> A. Equipment-List equipment to complete identified task. For large reclamation jobs, separate mine areas. <br /> Unit of <br /> Equipment Measure $/Unit #of Units Cost($) <br /> See following sheets(Task VIA) <br /> Task VIA-Wattle Installation $1,375 <br /> Total Equipment Cost for this Task= $1,375 <br /> B. Labor-List all labor categories to complete identified tasks Labor <br /> Surcharge/Hr <br /> (where applicable) <br /> (enter%of wage) <br /> $/Hour <br /> Labor Category (prevailing wage) 0.0% #of Hours Cost($) <br /> See following sheets (Task VIA) <br /> Task VIA-Wattle Installation $588 <br /> Total Labor Cost for this Task= $588 <br /> C. Materials -List all materials required to complete identified task <br /> Sales tax <br /> enter local rate in <br /> Item $/Unit 0.0% Quantity Cost($) <br /> See following sheets(Task VIA) <br /> Task VIA-Wattle Installation $6,505 <br /> Total Materials Cost for this Task= $6,505 <br /> D. Total Direct Cost for this task <br /> Equipment Cost+ Labor Cost+ Materials Cost= $8,468 <br />
The URL can be used to link to this page
Your browser does not support the video tag.