Laserfiche WebLink
COLORADO <br /> „ 0Division of Reclamation, <br /> Mining and Safety <br /> Department of Natural Resources <br /> 19 August 2022 <br /> Ty Stogsdill <br /> Lincoln Co <br /> 103 Third Ave. <br /> PO Box 39 <br /> Hugo, CO 80821 <br /> Re: Lincoln County; Harold Eichman Gravel Pit File No. M1985105 <br /> Preliminary Adequacy 112 Reclamation Permit CN1 Application <br /> Mr. Stogsdill: <br /> On 28 June 2022,the Division of Reclamation,Mining and Safety(Division/DRMS) <br /> received a 112 Construction Materials Reclamation Permit Conversion(CNl),Application <br /> package from Lincoln County for the Harold Eichman Gravel Pit File No. M1985105. On <br /> II July 2022 the application was deemed incomplete for lack of a public notice at the <br /> entrance. The operator provided proof that the notice was posted and the application was <br /> deemed complete at the end of the day on 11 July 2022. A partial response to adequacy <br /> was conducted over the phone on 22 July 2022. DRMS requested that adequacy pages be <br /> mailed to the Division. DRMS received an email with revised pages on 4 August 2022. <br /> The operation is anticipated to be active for 10 years,from 2022 through 2023. The post <br /> mining land use specified is general agriculture. <br /> The Division received the conversion fee for a 112 operation as required. <br /> 6.4.2 Exhibit B Index Map <br /> DRMS 13 July <br /> Please update the legal description to identify the affected area and include the acreage of the affected <br /> area on the Index Map. <br /> Phone conversation on 22 July 2022,adequately addressed this item. <br /> 6.4.4 Exhibit D Mining Plan <br /> DRMS 13 July <br /> 1. Please provide an approximate timetable describing the mining operation. This would include <br /> the sequence of each phase and an estimate of the periods of time required for the various stages <br /> of the operation. <br /> o excavation, <br /> o backfilling and grading of any highwall <br /> o topsoiling <br /> o seeding <br /> 2. Please provide an estimate of time periods required for each phase of the operation. <br /> 3. Please update the Mining Plan Map (Exhibit C),to indicate the location of material, <br /> overburden and topsoil stockpiles. <br />