Laserfiche WebLink
3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and <br /> redistributed for the re-establishment of vegetation. Specify approximate topsoil <br /> redistribution depth: <br /> No topsoil exists at the proposed drilling locations. <br /> 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br /> abandonment procedures): <br /> Only one hole will be open at any one time. Each hole will be reclaimed fefore the next <br /> below the surface, and the area above the plug filled with a mixture of cement, drill <br /> cuttings, and residual rfi water. I he concrete at heachhole will a finiShed off level <br /> with the surface of the Surrounding rock <br /> S. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be <br /> reclaimed (refer to Rule 3 and Rule 5 for specific reclamation performance standards). <br /> You may wish to contact the Division for closure specifications. <br /> Reclamation will consist of plugging the drill holes, removing equipment, and where <br /> . <br /> Form 2—Public File Page 9 of 14 <br />