Laserfiche WebLink
COLORADO <br /> Division of Reclamation, <br /> Mining and Safety <br /> Department of Natural Resources <br /> MINERALS PROGRAM INSPECTION REPORT <br /> PHONE: (303) 866-3567 <br /> The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br /> noted below. This report documents observations concerning compliance with the terms of the permit <br /> and applicable rules and regulations of the Mined Land Reclamation Board. <br /> MINE NAME: MINE/PROSPECTING ID#: MINERAL: COUNTY: <br /> Hidden Valley Gravel Pit M-1998-024 Sand and gravel Eagle <br /> INSPECTION TYPE: INSPECTOR(S): INSP.DATE: INSP. TIME: <br /> Monitoring Leigh Simmons June 13,2022 11:00 <br /> OPERATOR: OPERATOR REPRESENTATIVE: TYPE OF OPERATION: <br /> Oldcastle SW Group,Inc. dba B&B Excava Jason Burkey 112c-Construction Regular Operation <br /> REASON FOR INSPECTION: BOND CALCULATION TYPE: BOND AMOUNT: <br /> Normal I&E Program Complete Bond $99,000.00 <br /> DATE OF COMPLAINT: POST INSP. CONTACTS: JOINT INSP.AGENCY: <br /> NA None None <br /> WEATHER: INSPECTOR'S SIGNATURE: SIGNATURE DATE: <br /> Clear August 9,2022 <br /> The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br /> SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br /> WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br /> Possible Violation is indicated,you will be notified under separate cover as to when the Mined Land <br /> Reclamation Board will consider possible enforcement action. <br /> INSPECTION TOPIC: Financial Warranty <br /> PROBLEM/POSSIBLE VIOLATION: Problem: The financial warranty is not adequate to reclaim the site in <br /> accordance with the approved reclamation plan. This is a failure to maintain the proper financial warranty <br /> amount to complete reclamation of the affected lands pursuant to C.R.S. 34-32.5-117(4)(b) of the Act. <br /> CORRECTIVE ACTIONS:The operator shall submit adequate financial warranty, as determined by the Division. <br /> The Division will be sending a separate surety increase notice to the operator regarding the increase of the <br /> financial warranty.The operator will have 60 days from the date on the surety increase notice to post the <br /> additional financial warranty. <br /> CORRECTIVE ACTION DUE DATE: 9/9/22 <br /> Page 1 of 9 <br />