My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-08-10_INSPECTION - M1998024
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1998024
>
2022-08-10_INSPECTION - M1998024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2022 7:31:57 AM
Creation date
8/11/2022 2:15:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998024
IBM Index Class Name
Inspection
Doc Date
8/10/2022
Doc Name
Inspection Report
From
DRMS
To
Oldcastle SW Group , Incdba B & B Excavating
Inspection Date
6/13/2022
Email Name
LDS
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task#04A Page 2 of 2 <br /> Cycle Time: <br /> Scraper Loading Time: 0.80 Minutes <br /> Maneuver and Spread Time: 0.60 Minutes <br /> Job Condition Correction: Site Altitude: 6350 feet <br /> Scraper Push Dozer Source <br /> Altitude Ad': 1.000 1.000 (CAT HB) <br /> Job Efficiency: 0.830 0.830 (CAT HB) <br /> Net Correction: 0.830 0.830 <br /> Travel Time: <br /> Road Condition: Rutted dirt,little maintenance,no water,2"tire penetration 5.0 <br /> Haul Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity(fpm) Travel Time <br /> (min) <br /> 1 350.00 0.00 5.00 5.00 1867 0.28 <br /> Haul Time: 0.28 minutes <br /> Return Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity(fpm) Travel Time <br /> (%) (%) (%) (min) <br /> 1 350.00 0.00 5.00 5.00 2795 0.29 <br /> Return Time: 0.29 minutes <br /> Total Scraper team cycle time: 1.97 minutes <br /> Adjusted for job conditions: 733.10 LCY/Hour <br /> Selected Number of Scrapers: 1 Scraper(s) <br /> Adjusted single scraper team(unit)hourly production: 733.10 LCY/Hour <br /> Adjusted multiple scraper team(fleet)hourly production: 733.10 LCY/Hour <br /> Unadjusted unit production/hour: 883.25 LCY/Hour <br /> Optimal Number of Scrapers per push dozer: <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 77.03 Hours <br /> Unit cost: $1.167 /LCY Total job cost: $65,877 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.