Laserfiche WebLink
Scraper Worksheet Cont'd Task#04A Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Distribute topsoil over 30 acre disturbed area <br /> Site: Hidden Valley Gravel Pit Permit Action: 2022 Inspection Permit/Job#: M1998024 <br /> PROJECT IDENTIFICATION <br /> Task#: 04A State: Colorado Abbreviation: None <br /> Date: 8/9/2022 County: Eagle Filename: 024-04a <br /> User: LDS <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 637G <br /> -Dozer: Cat D8T-8SU <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 100 NA NA NA NA <br /> Ownership cost/hour: $264.49 $124.85 NA NA NA NA <br /> Operating cost/hour: $296.10 $97.63 NA NA NA NA <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own.cost/hour: NA $0.00 NA NA NA NA <br /> Ripper op.cost/hour: NA $0.00 NA NA NA NA <br /> Operator cost/hour: $30.90 $41.30 NA NA NA NA <br /> Unit Subtotals: $591.49 $263.78 NA NA NA NA <br /> Number of Units: 1 1 0 0 0 0 <br /> Group Subtotals: Work: $855.27 Support: $0.00 Maint: $0.00 <br /> Total work team cost/hour:$855.27 <br /> MATERIAL QUANTITIES <br /> Initial volume: 56,467 CCY Swell factor: 1.000 <br /> Loose volume: 56,467 LCY <br /> Source of estimated volume: 30 ac. A 14"depth <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 1,600 Ibs/LCY Struck Volume: 24.00 LCY <br /> Material description: Top Soil Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 51.00 LCY Adjusted Capacity: 29.00 LCY <br /> CIRCES Cost Estimating Software <br />