The Final East Pit Ditch was inspected and was dry. The ditch was stable and no issues observed. <br /> Section 25 and Section 26 Ponds associated with the Collom Pit were inspected.Both ponds held water but neither <br /> were discharging at the time of the inspection.Maintenance has been completed at the Section 25 pond. Water <br /> levels were well below the discharge point so it was unclear if the leak that was occurring has been fixed.No <br /> issues were observed with either pond. <br /> f <br /> West Taylor Pond. Section 25 Pond. <br /> GENERAL MINE PLAN COMPLIANCE: <br /> Mining activities are currently on going in the South Taylor Pit and Collom Pit as approved. Primary mining <br /> activities in the South Taylor Pit is being done by dragline. The Collom Pit is currently being mined with highwall <br /> mining and truck/shovel operations. Once the South Taylor Pit no longer needs the dragline,the dragline is <br /> approved to be moved over to the Collom Pit. <br /> ampom <br /> - 04 --- <br /> Truck/shovel operation at Collom Pit. <br /> RECLAMATION SUCCESS-Rule 4.15,Rule 3: <br /> Recent precipitation events has helped the overall heath and establishment of vegetation throughout the site. <br />