Laserfiche WebLink
7. Monitoring Reclamation Success <br />Monitoring the reclamation on an ongoing basis will allow minor revisions to assure successful <br />reclamation. The operator plans to use the local NRCS office to assist in determining the ability of the <br />reclaimed land to control erosion. If minor changes or modifications are needed to the seeding and <br />reclamation plan, revision plans will be submitted to the Division as required. It is hoped that the <br />Division will provide assistance in evaluating the success of the ongoing reclamation process. All <br />areas disturbed and reclaimed and any other important items regarding the reclamation will be <br />submitted in the annual reports to the Division. <br />White River City <br />E-6 Lewicki &Associates <br />July 2022 <br />