Laserfiche WebLink
of"�oto <br /> *� COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> x <br /> 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> *1876* <br /> TR-1 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET ACY/THM <br /> File No.: M- 2006-084 Site Name:White River City Pit <br /> County Rio Blanco TR# ORMS Use only) <br /> Permittee:Oldcastle SW Group, Inc. dba United Companies <br /> Operator(If Other than Permittee): <br /> Permittee Representative:J aso n B u rkey RECEIVED <br /> Please provide a brief description of the proposed revision: juL 2 9 ZUZZ <br /> Change mining plan to accommodate a smaller processing footprint. MINING 8N SARECLAMATION, <br /> E Y A HERON, <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review" until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR;however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type -Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Tyne Required TR Fee Submitted (mark only one) <br /> 1 IOc, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 <br /> 110d, 112d(1, 2 or 3) $1006 <br />