My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-07-25_INSPECTION - C1981035
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981035
>
2022-07-25_INSPECTION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2022 2:24:16 PM
Creation date
7/25/2022 1:41:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Inspection
Doc Date
7/25/2022
Doc Name
Inspection Report
From
DRMS
To
GCC Energy, LLC
Inspection Date
7/19/2022
Email Name
LJW
THM
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 19,2022 C-1981-035/King Coal Mine LJW <br /> East and West CWD's have undergone recent cleanout efforts, removing weeds and other vegetative debris. <br /> Examples of the ditches can be seen in Photos Six and Seven. The ditches are cleared of all obstructions to allow <br /> flows to proceed unobstructed. The large Sediment Pond was observed to have a small amount of standing water <br /> flowing from the main operations area. The pond was not discharging at the time of the inspection and can be <br /> seen in Photo Eight. The downgradient ditches from the Sediment Pond have also undergone extensive cleanup <br /> operations removing the vegetation and vegetative debris. The ditches are unobstructed but do not show signs of <br /> recent flows. <br /> The fuel and hazardous materials storage area located at the King II facility was observed and in good condition. <br /> All items stored in the area contained appropriate secondary containment and is neat and orderly. No evidence of <br /> spills or loss of containment was noted. The storage area can be seen in Photo Nine. <br /> PHOTOGRAPHS <br /> a a <br /> Y Photo One: View southeast,showing the upper reaches of the East CWD at the <br /> _ King I Facility. The ditch is free from obstruction and appears able to function as <br /> designed.No evidence of recent flows was noted. <br /> Number of Partial Inspection this Fiscal Year: 1 <br /> Number of Complete Inspections this Fiscal Year: 0 <br /> Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.