My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-07-19_REVISION - M1987026 (31)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987026
>
2022-07-19_REVISION - M1987026 (31)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2025 6:28:09 AM
Creation date
7/19/2022 3:22:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987026
IBM Index Class Name
Revision
Doc Date
7/19/2022
Doc Name Note
BLM Environmental Assessment
Doc Name
Adequacy Review Response #3
From
Colorado Quarries Inc
To
DRMS
Type & Sequence
CN1
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bureau of Land Management Appendices <br /> Royal Gorge Field Office DOI-BLM-CO-F020-2020-0036 EA <br /> remain. No additional grading, slope reduction, information <br /> or backfilling will be performed. provided in <br /> 2.e. <br /> All grading performed during and after mining Dependent <br /> will ensure that no slopes are steeper than on the <br /> f. Grading 2H:1 V. Slope and surface grading will be N N N information <br /> performed prior to topsoil placement. Grading provided in <br /> will be carried out in year 1. 2.e. <br /> Good topsoil exists on many areas of the <br /> expanded site. It is estimated that 3-to-6-inch <br /> depth can be salvaged.No soil amendments are <br /> expected to be needed.All topsoil that can be <br /> reasonably stripped will be stored and protected <br /> g. Soil until needed for reclamation. Sufficient topsoil <br /> stabilization and exists on the site to be able to replace topsoil to N N N - <br /> revegetation enhance revegetation. Topsoil replacement and <br /> seeding will be performed in years 1 and 2. <br /> Monitoring will continue as long as needed, <br /> which is expected to be until year 4 or 5. Seed <br /> mix will be the same as provided in the approved <br /> CDRMS 110 permit. <br /> h. Cost estimate _ <br /> (for locatable N/A -operations only) <br /> A-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.