Laserfiche WebLink
Bureau of Land Management Appendices <br /> Royal Gorge Field Office DOI-BLM-CO-F020-2020-0036 EA <br /> material <br /> disposal. <br /> Final SWMP <br /> updates will <br /> be designed <br /> and <br /> submitted <br /> following <br /> authorization <br /> 7. Quality Assurance/Quality Control <br /> a. Active mining <br /> monitoring plans - <br /> 1) Air quality, Mine site will be permitted with the above <br /> water quality, permits following the initiation of the expansion. <br /> water quantity, The site will be regularly monitored during <br /> noise,weeds, active operations and interim closures/delays. <br /> interim Frequency and type of monitoring depend on <br /> reclamation, and - N N - <br /> others as what is being monitored and who requires the <br /> applicable; 2) monitoring. The site is routinely inspected by all <br /> permitted agencies above.Any items not <br /> Tanks, facilities, managed by other permits or the BLM will be <br /> equipment, monitored by the operator on a routine basis. <br /> security structures, <br /> and others as <br /> applicable <br /> b. Interim <br /> (temporary <br /> cessation and/or for seasonal shutdown or temporary cessation - N N _ <br /> seasonal See 5o, above. <br /> shutdown) <br /> monitoring plans <br /> A-21 <br />