Laserfiche WebLink
Bureau of Land Management Appendices <br /> Royal Gorge Field Office DOI-BLM-CO-F020-2020-0036 EA <br /> the site not open. <br /> Standard safety signage, such as"No <br /> Trespassing" and"Caution,Blasting" will be <br /> m. Signage posted at entrance and above highwalls. The N N <br /> required DBMS permit ID sign will continue to N <br /> be posted at the entrance. It contains the site <br /> name,operator contact info, and permit number. <br /> 3. Access <br /> New road construction will all be within the <br /> permit boundaries. Onsite roads will be used to <br /> access areas for topsoil stockpiling, overburden <br /> removal and placement, and hauling ore to the <br /> upper pad. The operator will use the existing <br /> access/haul road as much as possible. Some <br /> minor realignment of this access/haul road at the <br /> revised boundary may be needed,to N N N _ <br /> accommodate the larger pad and pit ramp. Any <br /> a. Road new road segments that need to be constructed <br /> will match the existing road: 22-ft width, 5% <br /> construction maximum grade,road base with gravel surface, <br /> with a drainage ditch along the high side of road <br /> (and buried culverts along road at proper <br /> -intervals). <br /> Other onsite roads will be used mainly at the <br /> initiation of the mine expansion(for hauling <br /> overburden and topsoil),then their use should N N <br /> decrease dramatically, and except for periodic N <br /> hauling or maintenance activity, these should be <br /> nearly reclaimed before the end of the operation. <br /> A-8 <br />