My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-07-19_REVISION - M1987026 (11)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987026
>
2022-07-19_REVISION - M1987026 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 9:48:01 PM
Creation date
7/19/2022 3:07:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987026
IBM Index Class Name
Revision
Doc Date
7/19/2022
Doc Name Note
Exhibit D - Mining Plan
Doc Name
Adequacy Review Response #3
From
Colorado Quarries Inc
To
DRMS
Type & Sequence
CN1
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Please see the Exhibit E Reclamation Plan and Exhibit L Reclamation Costs for details regarding volumes, <br /> distances, and equipment involved with reclamation earthwork,and the revegetation plan,of each of <br /> the areas to reclaim. <br /> Conclusion of Mining <br /> At the conclusion of the operations,all areas and features of the site will be fully reclaimed. This means <br /> the quarry will have stable, benched highwalls;slopes will be topsoiled and revegetated (excluding in- <br /> quarry surfaces with exposed obsidian); earthen stormwater controls will remain as permanent <br /> structures; debris and contaminants will be removed and disposed of properly; roadways will be <br /> reclaimed by ripping followed by topsoiling and seeding; any overburden remaining after backfilling the <br /> pit floor up to the needed elevation will be smoothed,topsoiled and seeded;all stockpiled topsoil will <br /> be spread and seeded; all product stockpiles will be removed;all equipment and supplies will be <br /> removed;the benches will be topsoiled and seeded;the pit floor and operations pad area will be ripped, <br /> topsoiled and seeded. See Exhibit E for reclamation plan details. <br /> Mining Stage Timeframes <br /> Year 1 Strip topsoil from all areas of activity,windrow or place into stockpiles, and seed it. <br /> Strip overburden from area above pit expansion, place in stockpiles or use to construct <br /> SWMP structures, pad areas, roadways as needed. <br /> Concurrent reclamation where possible: seed disturbed areas that will not be <br /> redisturbed. <br /> Year 2-20 Active mining, including processing, stockpiling, and export of material. Pit highwalls <br /> and benches will be mined, pit floor will be backfilled at proper times of mining stages. <br /> Year 21-25 Reclamation. Removal of stockpiled product, removal of equipment, cleanup of site, pit <br /> backfill, replacement of overburden, pad and roadway grading/ripping, replacement of <br /> topsoil, revegetation seeding. <br /> Noxious Weed Control Plan, see following pages. <br /> Blasting Plan, see following pages. <br />
The URL can be used to link to this page
Your browser does not support the video tag.