My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-07-19_REVISION - M1987026 (11)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987026
>
2022-07-19_REVISION - M1987026 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 9:48:01 PM
Creation date
7/19/2022 3:07:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987026
IBM Index Class Name
Revision
Doc Date
7/19/2022
Doc Name Note
Exhibit D - Mining Plan
Doc Name
Adequacy Review Response #3
From
Colorado Quarries Inc
To
DRMS
Type & Sequence
CN1
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and dewatering will be necessary during all active quarry operations as the quarry is deepened. <br /> Dewatering will be carried out such that all water reports to the sediment ponds below the pit, where it <br /> will be temporarily detained. <br /> Dewatering will typically be carried out only prior to and during normal scheduled operations,which <br /> presently is seasonal and depending on demand. At most, pumping may only be necessary once a <br /> month, and would involve removing up to 50,000 gallons each time. Pumps move approximately 100 <br /> gallons per minute,which takes one day to empty the sump in the pit. Water is discharged into the <br /> stormwater pond downslope (southwest)from the pit and staging pad. At this rate and volume there is <br /> no sediment transport and the pond is not overtopped. <br /> Water that is pumped from the quarry(which will be inherently free of sediment)will be routed to the <br /> sediment control/stormwater pond below the toe of the expanded staging area pad. From there it will <br /> either percolate back into the ground or be released into the stream system. <br /> Ultimately,after the mining stages,the pit will be reclaimed to be free-draining. The operations pad at <br /> the mouth of the pit will be higher than the pit floor, so a drainage trench will be excavated to allow the <br /> pit to drain. Please refer to details in Exhibit E and F. <br /> Additional Concerns—Security.Stormwater Control, and Weed Control <br /> Throughout the life of this operation, erosion and presence of noxious weeds will continue to be <br /> monitored on all disturbed areas and addressed in a timely manner. Please see the noxious weed <br /> control plan at the end of this exhibit. <br /> A storage or transfer area for fuel and lube will be designated either on the operations pad or the <br /> processing pad area. It is expected that most fluids will be delivered to the site on the day that it is <br /> needed,without the need for a storage area. Regardless,this designated area will include berms, liners <br /> and secondary containment structures. <br /> The operator will install and maintain adequate stormwater controls for all affected areas of the site, <br /> including the quarry and operations pad areas, roadways, above-quarry slopes,topsoil stockpiles,and <br /> overburden cell. These controls may include earthen dams,culverts, ditches or diversions,and wattles <br /> or silt fence, as appropriate. See the Exhibit C maps for locations of the stormwater controls. <br /> The site will be kept secure by a locked and gated entrance. The areas above the highwall will contain <br /> signage and/or physical barriers to deter accidental falls, conforming to MSHA requirements. <br /> Reclamation—Overburden and Topsoil Handling, Revegetation <br /> Native topsoil is present throughout most of the undisturbed portions of the expanded permit area; <br /> though depths vary,the operator expects to be able to salvage between a 3-and 6-inch depth of soil. <br /> Topsoil that is stripped prior to all disturbances will be placed in one of the following areas: windrowed <br /> at the margins of the various areas of mining activities; placed near the overburden stockpile area (for <br /> spreading); on the outslope of the expanded staging and product stockpile area; on the new sloped <br /> surface of the area above the expanded highwall; or simply placed in the topsoil stockpiles for later use <br /> in reclamation. Topsoil will be spread on reclaimed surfaces at a depth of 3 to 6 inches(except on the <br /> benches,as noted above). All areas where topsoil is placed, including the topsoil stockpiles,will be <br /> seeded with the approved revegetation seed mix at the approved rates. <br />