Laserfiche WebLink
EXHIBIT C - Mining Plan <br /> Rule 6.3.3 <br /> The purpose of the mining plan is to describe how mining will affect the permit area for the duration of <br /> the operation. <br /> 1) Estimated dates of commencement: 07/17/2022 and completion: 06/17/2024 <br /> Note: Reclamation of all affected lands shall be completed within 12 months after issuance of the <br /> permit. An Operator possessing a 1 11(1)(b) Reclamation Permit must convert to the appropriate <br /> regular construction materials permit if extraction and export of materials from the site are not <br /> completed within 12 months after the issuance of the permit. <br /> 2) Depth of topsoil to be salvaged (check one): <br /> 4-6 inches =6-8 inches <br /> 8-10 inches =10-12 inches <br /> Other: <br /> N/A, explain: <br /> 3) Description of how topsoil will be stockpiled and stabilized: <br /> Topsoil will be striped and stockpiled in the north western portion of the pit area as shown on <br /> Mining Plan. A compacted containment berm will be placed around the pile to prevent erosion. <br /> 4) Thickness of overburden needed to be moved: 0 feet or V N/A <br /> 5) Thickness of deposit to be mined: 20 feet <br /> 6) How will the mine be accessed: (22), existing roads (1:1) new roads will be created <br /> a. Please describe the existing roads: <br /> There is an existing field access point to SH 115 at the provided lat/long, behind this <br /> field access is an existing two track dirt road past an existing depression. <br /> e improved access road will be 20 LF wide and 685 LF long <br /> b. If there will be new roads or road improvements, please describe the new roads and road <br /> improvements (note, new roads must be included in permitted acreage): <br /> The existing two track road will need to widened for access and thus is included in the <br /> permit boundaries. <br /> 7) Will water be needed during the mining operation (check one): t Ft-/�)Yes or (n) No <br /> a. If yes,please describe the source of the water and how much water will be used during the <br /> operation: <br /> Water will be used for dust control within the pit limits. It will be obtained from the Upper <br /> Arkansas Water Conservancy District. Estimated 20,000 gallons of water will be used <br />