Laserfiche WebLink
COLORADO <br /> \/ Division of Reclamation, <br /> ® Mining and Safety <br /> Department of Natural Resources <br /> July 11,2022 <br /> Mark Gray <br /> New Elk Coal Company,LLC. <br /> 12250 State Highway 12 <br /> Weston,Colorado 81091 <br /> Re: New Elk Mine(Permit No. C-1981-012) <br /> Technical Revision No.76(TR-76) <br /> Adequacy Review <br /> Dear Mr. Gray: <br /> After reviewing TR-76 from New Elk Coal Company,LLC.(New Elk),the Division has the following <br /> comments: <br /> Proposed Revised Section 2.03 <br /> 1. Proposed revised Map 1,New Elk Mine Surface Ownership does not appear to accurately depict <br /> the proposed expansion of the permit boundary.Based on the revised map,the Division estimates <br /> the permit boundary to be about 168 acres larger than the currently approved permit boundary. <br /> See the Figure below that depicts the permit boundary expansion as shown on proposed Map 1. <br /> Please revise the map to correctly depict the permit boundary to only include the 11.3 acre <br /> proposed expansion. <br /> flF'�010 <br /> 1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br /> Jared S. Polis, Governor I Dan Gibbs, Executive Director I Virginia Brannon, Director * 1876 * <br />